BRIC conducts its own additional specialized construction to increase the efficiency of logistics center operation management and asset durability.
A construction method that combines roof panels and roof waterproofing is applied to prevent rainwater from overflowing during the rainy season and flowing into the building, minimizing damage to goods in the warehouse.
The siphonic method is a high-efficiency drainage system that utilizes high pressure. Compared to the conventional gravity-type excellent piping method that uses the simple water drop effect, the pipe diameter is reduced and the space is reduced by using a minimum of granular pipes. You can increase your efficiency.
If the flatness of the floor is poor, it will be difficult for the forklift to move quickly, and collision with the rack will occur when pulling up the material. To minimize this, a super-flat floor finish is installed from above to increase the durability of the floor and the efficiency of movement and transportation.
Application of a folding door type combination door (class 1 airtightness) Reduces heat loss and is effective in reducing maintenance costs.
The approach road snowmelting construction prevents the approach road located on the slope from freezing due to snow and rainfall in winter, allowing vehicles to pass safely.
Weak stiffness causes cracks in the bottom of warehouse slabs.
BRIC strengthens the floor slab, the lower part, the upper back, concrete strength, etc. to minimize floor cracks.
A dual analog method and flame detector are installed to prevent fires.